River Forecast
Issued by NWS

Home | Current Version | Previous Version | Text Only | Print | Product List | Glossary On
Versions: 1 2 3 4 5 6 7 8
000
FGUS53 KMSR 231548
RVFM10

RIVER FORECAST
NWS NORTH CENTRAL RIVER FORECAST CENTER TWIN CITIES/CHANHASSEN MN
945 AM CST THU FEB 23 2017

: THIS PRODUCT HAS PRELIMINARY DATA THAT MAY BE SUBJECT TO REVISION.
: REFER TO YOUR LOCAL WFO FOR THE LATEST OFFICIAL RIVER FORECAST.
: NOTE...  This product includes observed precipitation, plus
:          forecast precipitation for the next 48 Hours.

: ------------------------------------------------------------
:  Next 48 hours... forecast precipitation is a mix of rain
:  and snow typing in the river model...
:
:  Upstream river rises are slowing down... and there is some
:  uncertainty in actual flows in area rivers... and ice...
:
:  Some locations on the mainstem Mississippi may rise to near
:  minor flood levels in the next 7 days... River forecasts
:  will be updated as needed.
: ------------------------------------------------------------
:
:
: Upper Iowa River  Dorchester IA - DCHI4
: HSA:ARX   Flood Stage:14.0 FT   Fcst Issuance Stage:11.0 FT
.E DCHI4 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  13.4/ 13.7/ 13.2/ 12.0
.E DCHI4 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  11.8/ 11.6/ 11.4/ 11.3/ 11.3/ 11.3/ 11.5/ 11.7
.E1  11.7/ 11.6/ 11.5/ 11.5/ 11.4/ 11.3/ 11.2/ 11.0
.E1  10.9/ 10.7/ 10.6/ 10.4/ 10.2/ 10.1/ 10.0/ 9.9
.E1  9.9/ 9.9/ 9.9/ 10.0/
:
:
: Turkey River  Elkader IA - EKDI4
: HSA:ARX   Flood Stage:12.0 FT   Fcst Issuance Stage:10.0 FT
.E EKDI4 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  11.6/ 11.5/ 11.1/ 11.0
.E EKDI4 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  11.1/ 10.9/ 10.6/ 10.3/ 10.0/ 9.9/ 9.9/ 10.0
.E1  10.2/ 10.4/ 10.6/ 10.6/ 10.5/ 10.3/ 10.0/ 9.7
.E1  9.4/ 9.2/ 9.0/ 8.8/ 8.7/ 8.5/ 8.4/ 8.4
.E1  8.5/ 8.6/ 8.7/ 8.7/
:
:
: Mississippi River  Lake City MN - LKCM5
: HSA:ARX   Flood Stage:16.0 FT   Fcst Issuance Stage:13.0 FT
.E LKCM5 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  8.7/ 8.9/ 9.2/ 9.4
.E LKCM5 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  9.7/ 10.0/ 10.4/ 10.8/ 11.1/ 11.5/ 11.9/ 12.1
.E1  12.4/ 12.6/ 12.8/ 13.0/ 13.2/ 13.3/ 13.5/ 13.6
.E1  13.6/ 13.7/ 13.7/ 13.8/ 13.8/ 13.7/ 13.7/ 13.7
.E1  13.6/ 13.6/ 13.6/ 13.5/
:
:
: Mississippi River  Wabasha MN - WABM5
: HSA:ARX   Flood Stage:12.0 FT   Fcst Issuance Stage:10.0 FT
: ------------------------------------------------------------
: rise to near flood stage...
: ------------------------------------------------------------
: CREST FORECAST
.A WABM5  0228 Z DH12/DC02231545/HGIFFX  12.0
:
.E WABM5 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  8.4/ 8.5/ 8.7/ 8.8
.E WABM5 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  9.0/ 9.2/ 9.4/ 9.6/ 9.8/ 10.1/ 10.4/ 10.7
.E1  11.0/ 11.2/ 11.4/ 11.5/ 11.6/ 11.7/ 11.7/ 11.8
.E1  11.8/ 11.9/ 11.9/ 12.0/ 12.0/ 12.0/ 12.0/ 12.0
.E1  11.9/ 11.9/ 11.8/ 11.8/
:
:
: Mississippi River  Dam 4 / Alma WI - ALMW3
: HSA:ARX   Flood Stage:16.0 FT   Fcst Issuance Stage:10.0 FT
.E ALMW3 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  6.4/ 6.6/ 6.7/ 6.8
.E ALMW3 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  7.2/ 7.4/ 7.6/ 7.8/ 8.1/ 8.3/ 8.6/ 8.9
.E1  9.2/ 9.4/ 9.7/ 9.8/ 10.0/ 10.1/ 10.2/ 10.3
.E1  10.4/ 10.4/ 10.5/ 10.5/ 10.5/ 10.5/ 10.5/ 10.4
.E1  10.4/ 10.4/ 10.3/ 10.3/
:
:
: Mississippi River  Dam 5 / Minnesota City MN - MSCM5
: HSA:ARX   Flood Stage:660.0 FT   Fcst Issuance Stage:657.0 FT
.E MSCM5 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  652.6/ 653.0/ 653.4/ 653.4
.E MSCM5 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  653.6/ 653.7/ 653.8/ 654.0/ 654.2/ 654.4/ 654.7/ 655.0
.E1  655.4/ 655.7/ 656.0/ 656.3/ 656.5/ 656.8/ 657.0/ 657.2
.E1  657.3/ 657.4/ 657.5/ 657.6/ 657.6/ 657.7/ 657.7/ 657.7
.E1  657.6/ 657.6/ 657.6/ 657.5/
:
:
: Mississippi River  Dam 5a / Winona MN - WIDM5
: HSA:ARX   Flood Stage:656.0 FT   Fcst Issuance Stage:650.0 FT
.E WIDM5 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  647.7/ 648.1/ 648.3/ 648.5
.E WIDM5 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  649.0/ 649.2/ 649.4/ 649.5/ 649.7/ 649.8/ 650.0/ 650.3
.E1  650.6/ 650.9/ 651.2/ 651.5/ 651.8/ 652.1/ 652.3/ 652.6
.E1  652.8/ 653.0/ 653.1/ 653.2/ 653.3/ 653.3/ 653.4/ 653.4
.E1  653.4/ 653.4/ 653.4/ 653.3/
:
:
: Mississippi River  Winona MN - WNAM5
: HSA:ARX   Flood Stage:13.0 FT   Fcst Issuance Stage:11.0 FT
: CREST FORECAST
.A WNAM5  0301 Z DH12/DC02231545/HGIFFX  12.2
:
.E WNAM5 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  6.8/ 7.1/ 7.3/ 7.6
.E WNAM5 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  7.8/ 8.1/ 8.3/ 8.4/ 8.5/ 8.7/ 8.9/ 9.2
.E1  9.4/ 9.7/ 10.0/ 10.3/ 10.6/ 10.8/ 11.1/ 11.3
.E1  11.5/ 11.7/ 11.8/ 11.9/ 12.0/ 12.1/ 12.1/ 12.2
.E1  12.2/ 12.2/ 12.1/ 12.1/
:
:
: Mississippi River  Dam 6 / Trempeleau WI - TREW3
: HSA:ARX   Flood Stage:647.0 FT   Fcst Issuance Stage:644.0 FT
.E TREW3 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  641.6/ 641.7/ 641.9/ 642.0
.E TREW3 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  642.1/ 642.3/ 642.5/ 642.7/ 642.8/ 642.9/ 643.1/ 643.2
.E1  643.3/ 643.5/ 643.7/ 643.9/ 644.1/ 644.4/ 644.6/ 644.8
.E1  645.0/ 645.2/ 645.4/ 645.5/ 645.6/ 645.7/ 645.8/ 645.8
.E1  645.8/ 645.9/ 645.9/ 645.9/
:
:
: Mississippi River  Dam 7 / LaCrescent MN - LCRM5
: HSA:ARX   Flood Stage:641.0 FT   Fcst Issuance Stage:638.0 FT
.E LCRM5 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  634.2/ 634.2/ 634.2/ 634.3
.E LCRM5 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  634.6/ 635.0/ 635.3/ 635.7/ 636.1/ 636.5/ 636.8/ 637.0
.E1  637.1/ 637.2/ 637.3/ 637.4/ 637.5/ 637.7/ 637.8/ 638.0
.E1  638.2/ 638.3/ 638.5/ 638.6/ 638.8/ 638.9/ 638.9/ 639.0
.E1  639.0/ 639.0/ 639.0/ 639.0/
:
:
: Mississippi River  La Crosse WI - LACW3
: HSA:ARX   Flood Stage:12.0 FT   Fcst Issuance Stage:10.0 FT
: CREST FORECAST
.A LACW3  0301 Z DH12/DC02231545/HGIFFX  11.5
:
.E LACW3 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  7.3/ 7.3/ 7.4/ 7.4
.E LACW3 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  7.5/ 7.8/ 8.2/ 8.6/ 8.9/ 9.2/ 9.4/ 9.7
.E1  10.0/ 10.1/ 10.2/ 10.2/ 10.3/ 10.4/ 10.6/ 10.7
.E1  10.9/ 11.0/ 11.1/ 11.2/ 11.3/ 11.4/ 11.4/ 11.5
.E1  11.5/ 11.5/ 11.5/ 11.5/
:
:
: Mississippi River  Dam 8 / Genoa WI - GENW3
: HSA:ARX   Flood Stage:631.0 FT   Fcst Issuance Stage:629.0 FT
: CREST FORECAST
.A GENW3  0302 Z DH00/DC02231545/HTIFFX  630.4
:
.E GENW3 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  625.8/ 626.0/ 626.1/ 626.2
.E GENW3 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  626.3/ 626.4/ 626.6/ 626.9/ 627.2/ 627.6/ 627.9/ 628.3
.E1  628.5/ 628.7/ 628.8/ 629.0/ 629.1/ 629.2/ 629.3/ 629.4
.E1  629.6/ 629.7/ 629.8/ 629.9/ 630.1/ 630.1/ 630.2/ 630.3
.E1  630.3/ 630.4/ 630.4/ 630.4/
:
:
: Mississippi River  Lansing IA - LNSI4
: HSA:ARX   Flood Stage:17.0 FT   Fcst Issuance Stage:12.0 FT
.E LNSI4 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  9.2/ 9.2/ 9.3/ 9.4
.E LNSI4 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  9.4/ 9.5/ 9.6/ 9.7/ 9.7/ 9.8/ 9.9/ 10.0
.E1  10.2/ 10.3/ 10.5/ 10.6/ 10.8/ 10.9/ 11.0/ 11.1
.E1  11.2/ 11.3/ 11.4/ 11.5/ 11.6/ 11.7/ 11.8/ 11.8
.E1  11.9/ 12.0/ 12.1/ 12.2/
:
:
: Mississippi River  Dam 9 / Lynxville WI - LYNW3
: HSA:ARX   Flood Stage:625.0 FT   Fcst Issuance Stage:619.0 FT
.E LYNW3 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  618.0/ 618.3/ 618.5/ 618.6
.E LYNW3 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  618.8/ 618.9/ 619.0/ 619.1/ 619.2/ 619.3/ 619.4/ 619.6
.E1  619.8/ 620.0/ 620.1/ 620.3/ 620.5/ 620.6/ 620.8/ 620.9
.E1  621.0/ 621.2/ 621.3/ 621.5/ 621.6/ 621.7/ 621.9/ 622.0
.E1  622.1/ 622.2/ 622.3/ 622.4/
:
:
: Mississippi River  McGregor IA - MCGI4
: HSA:ARX   Flood Stage:16.0 FT   Fcst Issuance Stage:13.0 FT
: CREST FORECAST
.A MCGI4  0303 Z DH12/DC02231545/HGIFFX  16.8
:
.E MCGI4 0222 Z DH18/DC02231545/HGIP/DIH06 :6-Hr Obs Stage (ft)
.E1  10.6/ 10.8/ 11.0/ 11.2
.E MCGI4 0223 Z DH18/DC02231545/HGIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  11.4/ 11.6/ 11.8/ 12.0/ 12.3/ 12.5/ 12.7/ 12.9
.E1  13.1/ 13.3/ 13.4/ 13.6/ 13.8/ 13.9/ 14.1/ 14.4
.E1  14.6/ 14.8/ 15.0/ 15.2/ 15.4/ 15.6/ 15.8/ 16.0
.E1  16.1/ 16.2/ 16.4/ 16.5/
:
:
: Mississippi River  Dam 10 TW IA - GTTI4
: HSA:ARX   Flood Stage:15.0 FT   Fcst Issuance Stage:12.0 FT
: CREST FORECAST
.A GTTI4  0303 Z DH12/DC02231545/HTIFFX  14.5
:
.E GTTI4 0222 Z DH18/DC02231545/HTIP/DIH06 :6-Hr Obs Stage (ft)
.E1  9.5/ 9.7/ 9.9/ 10.0
.E GTTI4 0223 Z DH18/DC02231545/HTIFF/DIH06 :6-Hr Fcst Stage (ft)
.E1  10.4/ 10.5/ 10.6/ 10.7/ 11.0/ 11.2/ 11.5/ 11.7
.E1  11.9/ 12.0/ 12.2/ 12.3/ 12.4/ 12.6/ 12.7/ 12.9
.E1  13.0/ 13.2/ 13.3/ 13.4/ 13.6/ 13.7/ 13.9/ 14.0
.E1  14.1/ 14.2/ 14.3/ 14.3/
:
:
:END

 NOTE...  This product includes observed precipitation, plus
          forecast precipitation for the next 48 Hours.

$$

 FCSTR EXT: 2535



USA.gov is the U.S. government's official web portal to all federal, state and local government web resources and services.