                OREGON DEPARTMENT OF TRANSPORTATION
            HIGHWAY TRAVEL CONDITIONS INFORMATION SYSTEM
                          INCIDENT REPORT


ROUTE:              US26
MILEPOINT:          96.14 to 96.48
AFFECTED LANES:

LOCATION:           From: US97, Madras
                    To: US97, Madras

COMMENTS:           Construction will be finishing up on the west side and
                    moving to the east side. All contracting work will be on
                    the south bound side. Week of 4-21 Cascade Gas will be
                    finishing up on the west side and moving to the east
                    side. TOMCO will start pole base installation conduit
                    placement on 4-23 if gas is moved. KRC will start conduit
                    excavation on the west side on 4-24. Week of 4-28 Cascade
                    will be finishing up any loose ends. TOMCO will be
                    placing pole bases and conduit. KRC will be excavating
                    for conduit and grading for sidewalk. RLC will be
                    starting sidewalks on 4-30. All contracting work will be
                    on the south bound side.

OCCURRED:           04/01/2014 08:00:00
CATEGORY:           C - Construction Work
SEVERITY:           7 - No to Minimum Delay

INCIDENT ID:        180810
CREATED:            04/14/2014 13:40:46
UPDATED:            04/18/2014 14:18:40

CONTACT NAME:       ODOT/CTOC Bend


-------------------------------------------------------------