River Summary Issued by NWS Marquette, MI
000
SRUS43 KMQT 171330
RVAMQT
MIC003-013-041-053-061-071-095-103-131-153-181330-
HYDROLOGIC SUMMARY
NATIONAL WEATHER SERVICE MARQUETTE MI
930 AM EDT MON JUN 17 2013
DAILY RIVER STAGE ROUNDUP
RIVER BASIN FLOOD/BFS LATEST CHANGE
LOCATION STAGE/STAGE STAGE DAY TIME 12HR 24HR 48HR
STURGEON RIVER
ALSTON 8.0/ 7.5 4.00 MON 06 AM -0.03 -0.04 -0.15
ONTONAGON RIVER
BERGLAND M/ M 3.36 MON 07 AM M M M
ESCANABA RIVER
ST NICHOLAS M/ M 2.31 MON 06 AM -0.03 0.00 -0.01
MICHIGAMME RIVER
WITCH LAKE 9.0/ 8.5 3.78 MON 08 AM -0.02 -0.06 -0.08
CRYSTAL FALLS 8.0/ 7.0 3.52 MON 07 AM 0.04 0.00 0.03
PAINT RIVER
CRYSTAL FALLS 7.0/ 5.5 2.47 MON 08 AM -0.02 -0.01 -0.04
FORD RIVER
HYDE 8.0/ 6.0 2.06 MON 09 AM M M M
ONTONAGON RIVER
BOND FALLS CANAL NEA M/ M 3.62 MON 09 AM -0.01 0.00 0.00
ROCKLAND 25.0/23.0 6.27 MON 09 AM -0.04 -0.07 -0.07
BLACK RIVER
BESSEMER 10.0/ 9.5 1.41 MON 09 AM -0.03 -0.07 -0.12
ONTONAGON RIVER
BERGLAND 8.0/ 5.5 2.46 MON 09 AM 0.16 -0.08 -0.06
CISCO LAKE OUTLET M/ M 4.76 MON 09 AM 0.01 0.00 0.00
STURGEON RIVER
SIDNAW 12.0/11.0 4.08 MON 08 AM -0.01 -0.01 -0.01
PESHEKEE RIVER
CHAMPION 8.5/ 8.0 M M M M M
ESCANABA RIVER
CORNELL 10.0/ 8.0 1.59 MON 09 AM 0.00 0.00 -0.05
GREENWOOD DIVERSION M/ M 0.88 MON 09 AM 0.00 0.00 0.00
GREENWOOD RELEASE NE M/ M 2.18 MON 08 AM -0.07 -0.06 -0.10
SCHWEITZER CREEK
PALMER 6.5/ 5.5 2.94 MON 09 AM 0.00 0.08 0.11
SCHWEITZER RESERVOIR M/ M 37.85 MON 09 AM M M M
ESCANABA RIVER
HUMBOLDT 6.5/ 5.0 2.20 MON 09 AM -0.02 -0.05 -0.05
SILVER RIVER
L`ANSE M/ M 4.64 MON 09 AM -0.01 -0.02 -0.02
L`ANSE 14.0/13.0 6.50 MON 09 AM -0.02 -0.04 -0.02
MANISTIQUE RIVER
MANISTIQUE M/11.0 4.07 MON 09 AM -0.03 -0.06 -0.14
STURGEON RIVER IN DELTA COUNTY
NAHMA JUNCTION 10.0/ 8.0 3.96 MON 09 AM -0.01 -0.02 -0.04
ONTONAGON RIVER
PAULDING 12.0/11.0 3.99 MON 08 AM -0.03 -0.04 -0.07
TRAP ROCK RIVER
LAKE LINDEN 9.5/ 8.5 3.01 MON 09 AM 0.00 -0.01 0.00
YELLOW DOG RIVER
BIG BAY M/ M 4.05 MON 09 AM -0.02 -0.04 -0.03
SALMON TROUT RIVER
BIG BAY M/ M 0.52 MON 08 AM 0.01 0.00 0.00
BIG BAY M/ M 1.66 MON 09 AM 0.01 -0.02 0.01
TAHQUAMENON RIVER
PARADISE 10.0/ 9.5 3.36 MON 08 AM 0.00 -0.06 -0.15
AU TRAIN RIVER
AU TRAIN RIVER AT FO M/ 6.0 3.50 MON 09 AM 0.00 -0.01 -0.01
MICHIGAMME RIVER
WAY DAM M/ 5.0 M M M M M
BFS STAGE = BANKFULL STAGE
CURRENT RIVER STAGE DATA PROVIDED COURTESY OF THE UNITED STATES
GEOLOGICAL SURVEY...WE ENERGIES...AND THE UPPER PENINSULA POWER
COMPANY.
$$