River Forecast
Issued by NWS

Home |  Current Version |  Previous Version |  Text Only |  Print | Product List |  Glossary On
Versions: 1 2
380
FGUS53 KMSR 311330
RVFILO

RIVER FORECAST
NATIONAL WEATHER SERVICE
NWS NORTH CENTRAL RIVER FORECAST CENTER; CHANHASSEN MN
829 AM CDT SUN AUG 31 2025

: THIS IS A NWS GUIDANCE PRODUCT FROM THE NORTH CENTRAL RIVER
: FORECAST CENTER.  PUBLIC FORECASTS AND WARNINGS ARE ISSUED BY NWS
: WEATHER FORECAST OFFICES.
:
: FORECAST GROUP IS ILO
:
: FORECASTS INCLUDE 24-HOURS OF FUTURE PRECIPITATION (QPF) IN 6 HOUR INCREMENTS
:
:************************************************************
:ILLINOIS RIVER, MORI2
:MORRIS, IL - LOT
:
:ACTION STAGE      13.0 FTMINOR STAGE       16.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       22.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 5.3 FT AT 1200 Z ON AUG 31
.ER MORI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   5.3 /   5.0 /   5.0
.E2    : 0901 :   /   5.0 /   5.0 /   5.0 /   5.0
.E3    : 0902 :   /   5.0 /   5.0 /   5.0 /   5.0
.E4    : 0903 :   /   5.0 /   5.0 /   5.0 /   5.0
.E5    : 0904 :   /   5.0 /   5.0 /   5.0 /   5.0
.E6    : 0905 :   /   5.0 /   5.0 /   5.0 /   5.0
.E7    : 0906 :   /   5.0 /   5.0 /   5.0 /   5.0
.E8    : 0907 :   /   5.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, MMOI2
:MARSEILLES L&D 2W, IL - LOT
:
:ACTION STAGE     466.0 FTMINOR STAGE      467.0 FT
:MODERATE STAGE   469.5 FTMAJOR STAGE      473.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 459.1 FT AT 1200 Z ON AUG 31
.ER MMOI2 0831 Z DC202508311329/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           / 459.2 / 459.3 / 459.3
.E2    : 0901 :   / 459.3 / 459.3 / 459.3 / 459.3
.E3    : 0902 :   / 459.3 / 459.3 / 459.3 / 459.3
.E4    : 0903 :   / 459.3 / 459.3 / 459.3 / 459.3
.E5    : 0904 :   / 459.3 / 459.3 / 459.3 / 459.3
.E6    : 0905 :   / 459.3 / 459.3 / 459.3 / 459.3
.E7    : 0906 :   / 459.3 / 459.3 / 459.3 / 459.3
.E8    : 0907 :   / 459.3
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, SRDI2
:UTICA-STARVED ROCK L&D 6, IL - LOT
:
:ACTION STAGE     449.0 FTMINOR STAGE      450.0 FT
:MODERATE STAGE   460.0 FTMAJOR STAGE      465.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 440.8 FT AT 1200 Z ON AUG 31
.ER SRDI2 0831 Z DC202508311329/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           / 440.8 / 440.9 / 440.9
.E2    : 0901 :   / 440.9 / 440.9 / 440.9 / 440.9
.E3    : 0902 :   / 440.9 / 440.9 / 440.9 / 440.9
.E4    : 0903 :   / 440.9 / 440.8 / 440.8 / 440.8
.E5    : 0904 :   / 440.8 / 440.8 / 440.8 / 440.8
.E6    : 0905 :   / 440.8 / 440.8 / 440.8 / 440.8
.E7    : 0906 :   / 440.8 / 440.8 / 440.8 / 440.8
.E8    : 0907 :   / 440.8
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, LSLI2
:LA SALLE 1S, IL - LOT
:
:ACTION STAGE      19.0 FTMINOR STAGE       20.0 FT
:MODERATE STAGE    27.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 11.0 FT AT 1200 Z ON AUG 31
.ER LSLI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /  11.0 /  11.0 /  10.9
.E2    : 0901 :   /  10.8 /  10.8 /  10.8 /  10.8
.E3    : 0902 :   /  10.8 /  10.8 /  10.8 /  10.8
.E4    : 0903 :   /  10.8 /  10.8 /  10.8 /  10.8
.E5    : 0904 :   /  10.8 /  10.8 /  10.8 /  10.8
.E6    : 0905 :   /  10.8 /  10.7 /  10.7 /  10.7
.E7    : 0906 :   /  10.7 /  10.7 /  10.7 /  10.7
.E8    : 0907 :   /  10.7
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HNYI2
:HENRY, IL - ILX
:
:ACTION STAGE      22.0 FTMINOR STAGE       23.0 FT
:MODERATE STAGE    24.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 14.6 FT AT 1200 Z ON AUG 31
.ER HNYI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /  14.6 /  14.6 /  14.6
.E2    : 0901 :   /  14.5 /  14.5 /  14.5 /  14.5
.E3    : 0902 :   /  14.5 /  14.5 /  14.5 /  14.5
.E4    : 0903 :   /  14.5 /  14.5 /  14.5 /  14.5
.E5    : 0904 :   /  14.5 /  14.5 /  14.5 /  14.5
.E6    : 0905 :   /  14.5 /  14.5 /  14.5 /  14.5
.E7    : 0906 :   /  14.5 /  14.5 /  14.5 /  14.5
.E8    : 0907 :   /  14.5
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, PIAI2
:PEORIA - BOAT YARD, IL - ILX
:
:ACTION STAGE      17.0 FTMINOR STAGE       18.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 11.9 FT AT 1200 Z ON AUG 31
.ER PIAI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /  11.9 /  11.9 /  11.9
.E2    : 0901 :   /  11.9 /  11.9 /  11.9 /  11.9
.E3    : 0902 :   /  11.9 /  11.9 /  11.9 /  11.9
.E4    : 0903 :   /  11.9 /  11.9 /  11.9 /  11.9
.E5    : 0904 :   /  11.9 /  11.9 /  11.9 /  11.9
.E6    : 0905 :   /  11.9 /  11.9 /  11.9 /  11.9
.E7    : 0906 :   /  11.9 /  11.9 /  11.9 /  11.9
.E8    : 0907 :   /  11.9
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, PRAI2
:PEORIA 5SSW - L&D 7, IL - ILX
:
:ACTION STAGE     444.0 FTMINOR STAGE      447.0 FT
:MODERATE STAGE   449.0 FTMAJOR STAGE      455.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 432.3 FT AT 1200 Z ON AUG 31
.ER PRAI2 0831 Z DC202508311329/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           / 432.2 / 432.1 / 432.0
.E2    : 0901 :   / 431.9 / 431.8 / 431.7 / 431.7
.E3    : 0902 :   / 431.6 / 431.5 / 431.5 / 431.4
.E4    : 0903 :   / 431.4 / 431.4 / 431.4 / 431.3
.E5    : 0904 :   / 431.3 / 431.2 / 431.2 / 431.1
.E6    : 0905 :   / 431.0 / 431.0 / 430.9 / 430.8
.E7    : 0906 :   / 430.8 / 430.7 / 430.7 / 430.7
.E8    : 0907 :   / 430.6
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HAVI2
:HAVANA , IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    17.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 6.2 FT AT 1200 Z ON AUG 31
.ER HAVI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   6.1 /   6.0 /   5.9
.E2    : 0901 :   /   5.8 /   5.7 /   5.6 /   5.6
.E3    : 0902 :   /   5.6 /   5.5 /   5.5 /   5.5
.E4    : 0903 :   /   5.5 /   5.5 /   5.5 /   5.4
.E5    : 0904 :   /   5.4 /   5.4 /   5.4 /   5.4
.E6    : 0905 :   /   5.3 /   5.3 /   5.3 /   5.3
.E7    : 0906 :   /   5.3 /   5.3 /   5.3 /   5.3
.E8    : 0907 :   /   5.3
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, BEAI2
:BEARDSTOWN, IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 9.6 FT AT 1200 Z ON AUG 31
.ER BEAI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   9.6 /   9.6 /   9.6
.E2    : 0901 :   /   9.6 /   9.6 /   9.5 /   9.5
.E3    : 0902 :   /   9.5 /   9.4 /   9.4 /   9.4
.E4    : 0903 :   /   9.4 /   9.4 /   9.3 /   9.3
.E5    : 0904 :   /   9.3 /   9.3 /   9.3 /   9.3
.E6    : 0905 :   /   9.3 /   9.2 /   9.2 /   9.2
.E7    : 0906 :   /   9.2 /   9.1 /   9.1 /   9.1
.E8    : 0907 :   /   9.1
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, NLGI2
:LA GRANGE L&D 8, IL - LSX
:
:ACTION STAGE      21.0 FTMINOR STAGE       23.0 FT
:MODERATE STAGE    27.0 FTMAJOR STAGE       29.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 8.4 FT AT 1200 Z ON AUG 31
.ER NLGI2 0831 Z DC202508311329/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   8.4 /   8.3 /   8.2
.E2    : 0901 :   /   8.2 /   8.1 /   8.1 /   7.9
.E3    : 0902 :   /   7.6 /   7.5 /   7.5 /   7.4
.E4    : 0903 :   /   7.4 /   7.4 /   7.4 /   7.4
.E5    : 0904 :   /   7.3 /   7.3 /   7.3 /   7.3
.E6    : 0905 :   /   7.3 /   7.3 /   7.3 /   7.2
.E7    : 0906 :   /   7.2 /   7.2 /   7.1 /   7.0
.E8    : 0907 :   /   7.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, MROI2
:MEREDOSIA PWR PLANT, IL - LSX
:
:ACTION STAGE      14.0 FTMINOR STAGE       17.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       24.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 3.6 FT AT 1200 Z ON AUG 31
.ER MROI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   3.5 /   3.4 /   3.3
.E2    : 0901 :   /   3.2 /   3.2 /   3.1 /   3.0
.E3    : 0902 :   /   2.9 /   2.8 /   2.8 /   2.7
.E4    : 0903 :   /   2.7 /   2.6 /   2.6 /   2.5
.E5    : 0904 :   /   2.5 /   2.5 /   2.5 /   2.4
.E6    : 0905 :   /   2.4 /   2.4 /   2.3 /   2.3
.E7    : 0906 :   /   2.2 /   2.2 /   2.1 /   2.1
.E8    : 0907 :   /   2.1
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, VALI2
:VALLEY CITY, IL - LSX
:
:ACTION STAGE      11.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    21.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 3.1 FT AT 1200 Z ON AUG 31
.ER VALI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /   3.0 /   3.0 /   2.9
.E2    : 0901 :   /   2.9 /   2.8 /   2.8 /   2.7
.E3    : 0902 :   /   2.7 /   2.6 /   2.5 /   2.5
.E4    : 0903 :   /   2.4 /   2.4 /   2.3 /   2.3
.E5    : 0904 :   /   2.3 /   2.2 /   2.2 /   2.2
.E6    : 0905 :   /   2.2 /   2.1 /   2.1 /   2.1
.E7    : 0906 :   /   2.0 /   2.0 /   1.9 /   1.9
.E8    : 0907 :   /   1.9
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HARI2
:HARDIN, IL - LSX
:
:ACTION STAGE      24.0 FTMINOR STAGE       25.0 FT
:MODERATE STAGE    31.0 FTMAJOR STAGE       32.0 FT
:
:THE RIVER STAGE WAS 20.1 FT AT 1300 Z ON AUG 31
.ER HARI2 0831 Z DC202508311329/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :           /  20.1 /  20.0 /  20.0
.E2    : 0901 :   /  20.0 /  19.9 /  19.9 /  19.9
.E3    : 0902 :   /  19.8 /  19.8 /  19.8 /  19.8
.E4    : 0903 :   /  19.8 /  19.7 /  19.7 /  19.7
.E5    : 0904 :   /  19.7 /  19.7 /  19.7 /  19.7
.E6    : 0905 :   /  19.7 /  19.7 /  19.7 /  19.7
.E7    : 0906 :   /  19.7 /  19.6 /  19.6 /  19.6
.E8    : 0907 :   /  19.6
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831            /  0.00 /  0.00 /  0.00
: 0901    /  0.00
:
: 24-hr QPF Total Ending on Sep 01 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:
:*******************************************************************
:
$$
:
FCSTR EXT: 2569
:
:...END of MESSAGE...